HOB Harry O. Bear

Hardware · HW·03

Power and charging

GaN adapters, power banks, cables and desk hubs. The strictest intake criteria of any line.

GaN adapters, power banks, cables and desk hubs. This is the category where cutting corners shows up fastest, so it carries the strictest intake of any line: cells, protection circuitry and cable strain relief are checked on every batch rather than sampled.

Entry
HW·03
Division
Hardware
Status
Line open
In the line
GaN adapters · Power banks · Cables and desk hubs
Checked
Every batch, not sampled
Checked for
Cells, protection circuitry, strain relief

Partner enquiries

How it is run

Power is the line where a bad unit does real damage, so the intake criteria are the tightest we run. Protection circuitry and cable rating are verified rather than accepted on a datasheet.

  • Brief — Wattage, port mix and protection class are fixed before sourcing.
  • Verification — Protection circuitry and cable rating are checked, not taken on trust.
  • Quality control — Thermal behaviour is sampled under sustained load.
Power and charging, design render
HW·03 · render, not a photograph
HW·03 · Power and charging Drawing sheet · not to scale

Concept · runs with HOB AI

Charge shaped to the cell.

Every line is drawn around the same assistant. It is asked for out loud, it resolves what it can on the device in front of you, and it answers with the thing rather than a conversation about the thing.

Power and charging, design render

HOB AI · on device

Ask
Ask what is charging
Understand
Cell state read on the adapter
Act
Current shaped to the battery, not the clock
HW·03 · concept, not a photograph Ask · Understand · Act
  • Ask — Ask what is charging and what it has left, without unplugging anything to find out.
  • Understand — Cell state is read on the adapter rather than inferred from a clock.
  • Act — Current is shaped to the battery, so the last stretch of a charge is not bought with cycles.

A concept drawing, not a shipping specification. The assistant is HOB AI and the device it was written for is HB·001.

Line manual

How HW·03 is specified, ordered and checked.

The standing orders for this line, in six pages. Drag a page across, or use the arrows.

01 · The line

Power and charging

Power is the line where a bad unit does real damage, so the intake criteria are the tightest we run. Protection circuitry and cable rating are verified rather than accepted on a datasheet.

02 · The unit

HW·03

Power and charging, exploded design render
Render — not a photograph

Rendered, not photographed. No unit of this line has been manufactured under the mark, so nothing here is a picture of a finished product.

Finish palette · drawn intent, not a supplier sample

Obsidian anodise#0B0B0C
Graphite anodise#17181A
Graphite light#202225
Brass#B98A3E
Brass lit#D7A954
Ivory#F4F3EF
03 · Brief

Brief

Wattage, port mix and protection class are fixed before sourcing.

Folding pin mechanism, macro detail render
Folding pin mechanism
Wattage
Fixed before sourcing
Port mix
Fixed before sourcing
Protection class
Fixed before sourcing
04 · Verification

Verification

Protection circuitry and cable rating are checked, not taken on trust.

Output ports, macro detail render
Output ports
Protection circuitry
Checked, not taken on trust
Cable rating
Checked, not taken on trust
Cells
Checked on every batch
Strain relief
Checked on every batch
05 · Quality control

Quality control

Thermal behaviour is sampled under sustained load.

Cable strain relief, macro detail render
Cable strain relief
Thermal behaviour
Sampled under sustained load
Load
Sustained, not burst
Intake
The strictest of any line
06 · On the record

Line open

Entry
HW·03
Division
Hardware
Status
Line open
In the line
GaN adapters · Power banks · Cables and desk hubs
Checked
Every batch, not sampled

Everything above describes how the line is run. It does not describe a product you can hold.

Funding

Back this line.

Raised
—
Target
To be set
Progress
0%
Round
Not open

No round is open and nothing is collected on this site. The form registers interest and reaches the same mailbox as a partner enquiry. Terms, instrument and any figures would be agreed in writing before money moves.